Hello everyone,
I am trying to use tie-ins for depth correction of a log. This well is 2300 meters , using interactive plot. I was able to linear shift -1.4 m, but i need to correct from 1250 m up.
So I input the measured and actual tie-ins and selected the pass. when I click process a windows comes up asking if i want all the curves added to be corrected so "yes" to that one.
I want to check this correction on interactive plot and nothing happens no correction was done from the Tie-ins.
What step i am missing ? i cant get it to work, only the linear shift on interactive plot worked for me
thanks for the help!